Notes:
1.These settings are Global. Global Settings are global to the current Profile. These settings and options pertain to all of the Jobs in the current Profile and are used to define, configure and execute the launch of Profiles via the PeerSync engine. Arguments to be sent to PeerSync can be selected and setup from the Options/Commands screen.
2.Some features described on this page require the Multi Threading Option. Please visit http://www.peersoftware.com or contact Sales for additional information.
3.Using Multiple Job Threads will produce a different file output format for all modes of reporting and message logging (Reporting, Admin Reporting and Email Reporting). The output will NOT contain a start and stop section or a summary, each entry will also be initially marked with a date and time stamp. If use summary is selected for Admin or Email reporting then the standard selection will be used. The reason this is done is due to the fact that processes will be running in parallel.
4.We have exhaustively tested PeerSync operations using 50 Job threads and 10 Copy threads. Setting your threads over this limit may lead to potential operational issues. We strongly discourage the use of more then 50 threads, however, you do have the option to exceed this limit by placing a greater than symbol ">" before your desired thread value (maximum allowed is 200). We recommend you test your setting to ensure PeerSync continues to operate acceptably in your environment.
5.The Include open files (if possible) option should be used if you are using the Performance Options: Multiple Job Threads and Multiple Copy Threads.
6.When setting the Application Priority to High, PeerSync will use more then average CPU, you may want to use the Set Processor Affinity argument in this scenario. |